Skip to content

The use of an intermediate flowable base in restorations of endodontically treated premolars

Clinical evaluation of posterior composite restorations placed with an intermediate flowable base in endodontically treated premolars

Status
Active, not recruiting
Phases
Unknown
Study type
Interventional
Source
REBEC
Registry ID
RBR-107w28wf
Enrollment
Unknown
Registered
2022-10-10
Start date
2022-10-20
Completion date
Unknown
Last updated
2025-10-27

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Endodontics

Interventions

This is a Randomized, Controlled, Double-Blind Clinical Trial. Experimental group: 30 patients with endodontically treated premolars will receive post cementation and will be restored with a fluid bul
E06.323.428

Sponsors

Pontificia Universidade Católica de Paraná
Lead Sponsor
Pontificia Universidade Católica de Paraná
Collaborator

Eligibility

Age
18 Years to No maximum

Inclusion criteria

Inclusion criteria: Adult patients who underwent endodontic treatment in the past 30 days and currently have a temporary restoration in upper premolars. The teeth should have at least the buccal and lingual walls remaining and occlusal contacts in the teeth included in the study

Exclusion criteria

Exclusion criteria: Patients with teeth in need of indirect restorations due to significant loss of tooth structure, parafunctional habits, absence of the antagonist teeth, tooth mobility, and periodontally compromised condition.

Design outcomes

Primary

MeasureTime frame
The expected primary outcome is that restorations placed with different techniques will not demonstrate significantly different clinical performance.

Secondary

MeasureTime frame
Secondary outcomes are not expected

Countries

Brazil

Contacts

Public ContactBrenda Sanchez Leyton

Pontificia Universidade Católica de Paraná

brenda.leyton@pucpr.edu.br+55 (41) 3271-1515

Outcome results

None listed

Source: REBEC (via WHO ICTRP) · Data processed: Feb 3, 2026