Safety violations of rolling scaffolds
Conditions
Interventions
Sponsors
Eligibility
Inclusion criteria
Inclusion criteria: Inclusion of worksites of painting companies working with rolling scaffolds, ladders and stairs in 27 large cities in the Netherlands
Exclusion criteria
Exclusion criteria: Non-painting construction companies working on rolling scaffolds, ladders and stairs
Design outcomes
Primary
| Measure | Time frame |
|---|---|
| Number of safety violations compared to the number of observed construction locations; primary outcome measure at worksite level in two intervention arms and one control arm. | — |
Secondary
| Measure | Time frame |
|---|---|
| Reach (recruitment rate), provided interventions (dose delivered), received interventions (dose received), satisfaction, perceived effectiveness, costs; outcomes related to the two interventions in IC and IP arms | — |
Contacts
Academic Medical Center (AMC), Coronel Institute for Occupational and Environmental Health, P.O. Box 26600