Skip to content

Changes in Motor Latency During Spinal Decompression: Relationship to Outcomes

Changes in Motor Latency During Spinal Decompression: Relationship to Outcomes

Status
Completed
Phases
Unknown
Study type
Observational
Source
ClinicalTrials.gov
Registry ID
NCT02529943
Enrollment
25
Registered
2015-08-20
Start date
2016-05-31
Completion date
2022-05-01
Last updated
2022-05-24

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Spinal Stenosis

Keywords

Spinal Stenosis, Motor Evoked Potential

Brief summary

Is there a relationship between changes in motor evoked potential latency intraoperatively and post-operative changes in walking function in patients undergoing spinal decompression.

Detailed description

Is there a relationship between changes in motor evoked potential latency intraoperatively and post-operative changes in walking function in patients undergoing spinal decompression. Tests will include the pre and post decompression MEP (motor evoked potential) latency and pre and post surgery walking speed and quality of life assessments.

Interventions

None listed

Sponsors

University of Saskatchewan
Lead SponsorOTHER

Study design

Observational model
COHORT
Time perspective
PROSPECTIVE

Eligibility

Sex/Gender
ALL
Age
18 Years to No maximum
Healthy volunteers
No

Inclusion criteria

* Central spinal stenosis * Ability to ambulate prior to onset of symptoms

Exclusion criteria

* Arthritis affecting walking ability (hip, knee or ankle). * Diabetes * Implanted pacemaker or other electrostimulator.

Design outcomes

Primary

MeasureTime frameDescription
Motor Evoked Potential LatencyDay 0MEP latency at induction and completion of decompression

Secondary

MeasureTime frameDescription
10 m Timed Walking speedpre-surgery and 3 months post surgery10m timed walk
Quality of Life measured in SF-36pre-surgery and 3 months post surgerySF-36

Countries

Canada

Outcome results

None listed

Source: ClinicalTrials.gov · Data processed: Feb 4, 2026