Essential Hypertension
Conditions
Keywords
hypertension, angiotensin II type 1 receptor blocker, olmesartan
Brief summary
In patients naive to treatment or after a 2-week washout period for patients whose treatment was ineffective, the use of olmesartan was assessed in a 4-phase treatment scheme: monotherapy, addition of hydrochlorothiazide (2 phases), addition of amlodipine.
Interventions
olmesartan medoxomil tablets,or olmesartan medoxomil/hydrochlorothiazide tablets, if necessary + amlodipine tablets, if necessary. All interventions are once-daily for 4 to 9 weeks
Sponsors
Study design
Eligibility
Inclusion criteria
* Stage 1 and 2 hypertension without treatment for at least 2 weeks * Women with no risk of becoming pregnant
Exclusion criteria
* Study participation could result in risk to health of subject * Cardiovascular disease * Secondary hypertension or stage 3 hypertension * Myocardial infarction within the last 6 months * Congestive heart failure * Pulmonary edema * Valvular alterations or rheumatic cardiopathy * Clinically relevant conduction disorders significant arrhythmias * Alcohol or illicit drug use * Medication abuse * Pregnant or nursing women
Design outcomes
Primary
| Measure | Time frame | Description |
|---|---|---|
| Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 (Olmesartan 20 mg Monotherapy) | 4 - 9 wks of olmesartan monotherapy | Number of patients that achieved a blood pressure (BP) goal of less than 130/85 in the first group (olmesartan monotherapy 20 mg). If BP was \> or = to 140/90 at 4,8, or 9 wks the participant went to next level for an additional 4-9 weeks at the next medication level |
| Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 in First Titrated Group (Olmesartan 20 mg + 12.5 mg Hydrochlorothiazide) | 4 to 9 weeks on combination therapy | Number of patients that achieved a blood pressure goal of less than 130/85 in first titrated group (olmesartan 20 mg + 12.5 mg hydrochlorothiazide)If BP was \> or = to 140/90 at 4,8, or 9 wks the participant went to next level of medication for an additional 4-9 weeks |
| Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 in Second Titrated Group (Olmesartan 40 mg + 25 mg Hydrochlorothiazide) | 4 to 9 weeks | Number of patients that achieved a blood pressure goal of less than 130/85 in second titrated group (olmesartan 40 mg + 25 mg hydrochlorothiazide). If BP was \> or = to 140/90 at 4,8, or 9 wks the participant went to next level of medication for an additional 4-9 weeks. |
| Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 in Third Titrated Group (Olmesartan + Hydrochorothiazide + Amlodipine) | 4 - 9 weeks | Number of patients that achieved a blood pressure goal of less than 130/85 in third titrated group (olmesartan 40 mg + 25 mg hydrochlorothiazide + amlodipine 5 mg). This combination was maintained as long as the participant's blood pressure remained within predefined parameters. If not, participant discontinued for lack of efficacy. |
Participant flow
Recruitment details
The study pop. was defined by the inclusion criteria. This study was carried out in 14 centers in Brazil with inclusion 2 months after the first study subject, started in Aug 06. After the screening visit, the patients that met inclusion and exclusion criteria were selected to participate in the study. The last patient out was in Jul 07.
Pre-assignment details
A wash out period was needed in case of a previous inefficient antihypertensive medication, so it was interrupted from 2 to 3 wks before the enrollment. The patient could be excluded considering the exclusion criteria.
Participants by arm
| Arm | Count |
|---|---|
| Olmesartan + Hydrochlorothiazide + Amlodipine 1. olmesartan monotherapy was the starting dosage regimen. Blood pressure (BP) measurments were obtained at 4, 8 and 9 weeks. If BP goals were not met at a measurment point the participant's medication was elevated to the next step and BP measurments taken at the next 4, 8, and 9 weeks.
2. olmesartan 20 mg/ hydrochlorothiazide 12.5 mg tablets was the first titration regimen if blood pressure goals were not achieved
3. olmesartan 40 mg + hydrochlorothiazide 25 mg tablets was the second titration regimen if blood pressure goals were not achieved
4. olmesartan 40 mg + hydrochlorothiazide 25 mg tablets + amlodipine 5 mg tablets was the third titration regimen if blood pressure goals were not achieved | 144 |
| Total | 144 |
Withdrawals & dropouts
| Period | Reason | FG000 |
|---|---|---|
| Overall Study | Lack of Efficacy | 20 |
Baseline characteristics
| Characteristic | Olmesartan + Hydrochlorothiazide + Amlodipine |
|---|---|
| Age, Categorical <=18 years | 0 Participants |
| Age, Categorical >=65 years | 12 Participants |
| Age, Categorical Between 18 and 65 years | 132 Participants |
| Race/Ethnicity, Customized Asian | 7 Participants |
| Race/Ethnicity, Customized Black | 24 Participants |
| Race/Ethnicity, Customized Other | 30 Participants |
| Race/Ethnicity, Customized White | 83 Participants |
| Region of Enrollment Brazil | 144 participants |
| Sex: Female, Male Female | 74 Participants |
| Sex: Female, Male Male | 70 Participants |
Outcome results
Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 in First Titrated Group (Olmesartan 20 mg + 12.5 mg Hydrochlorothiazide)
Number of patients that achieved a blood pressure goal of less than 130/85 in first titrated group (olmesartan 20 mg + 12.5 mg hydrochlorothiazide)If BP was \> or = to 140/90 at 4,8, or 9 wks the participant went to next level of medication for an additional 4-9 weeks
Time frame: 4 to 9 weeks on combination therapy
Population: In this first titration group 106 patients started and 33 achieved their blood pressure goal. There were no dropouts and 73 subject started the second titration regimen.
| Arm | Measure | Value (NUMBER) |
|---|---|---|
| Olmesartan Monotherapy | Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 in First Titrated Group (Olmesartan 20 mg + 12.5 mg Hydrochlorothiazide) | 33 Participants |
Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 in Second Titrated Group (Olmesartan 40 mg + 25 mg Hydrochlorothiazide)
Number of patients that achieved a blood pressure goal of less than 130/85 in second titrated group (olmesartan 40 mg + 25 mg hydrochlorothiazide). If BP was \> or = to 140/90 at 4,8, or 9 wks the participant went to next level of medication for an additional 4-9 weeks.
Time frame: 4 to 9 weeks
Population: 73 patients started the second titration regimen and 41 met their blood pressure goal. There were no dropouts. 32 started the final titration regimen.
| Arm | Measure | Value (NUMBER) |
|---|---|---|
| Olmesartan Monotherapy | Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 in Second Titrated Group (Olmesartan 40 mg + 25 mg Hydrochlorothiazide) | 41 Participants |
Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 in Third Titrated Group (Olmesartan + Hydrochorothiazide + Amlodipine)
Number of patients that achieved a blood pressure goal of less than 130/85 in third titrated group (olmesartan 40 mg + 25 mg hydrochlorothiazide + amlodipine 5 mg). This combination was maintained as long as the participant's blood pressure remained within predefined parameters. If not, participant discontinued for lack of efficacy.
Time frame: 4 - 9 weeks
Population: 32 subjects started the third and final titration regimen and 12 met their blood pressure goals. 20 dropped out for lack of efficacy.
| Arm | Measure | Value (NUMBER) |
|---|---|---|
| Olmesartan Monotherapy | Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 in Third Titrated Group (Olmesartan + Hydrochorothiazide + Amlodipine) | 12 Participants |
Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 (Olmesartan 20 mg Monotherapy)
Number of patients that achieved a blood pressure (BP) goal of less than 130/85 in the first group (olmesartan monotherapy 20 mg). If BP was \> or = to 140/90 at 4,8, or 9 wks the participant went to next level for an additional 4-9 weeks at the next medication level
Time frame: 4 - 9 wks of olmesartan monotherapy
Population: In this first dosage group 144 started and 38 patients met their blood pressure goal; therefore, 106 started the first titration regimen. There were no dropouts.
| Arm | Measure | Value (NUMBER) |
|---|---|---|
| Olmesartan Monotherapy | Number of Patients That Achieved a Blood Pressure Goal of Less Than 130/85 (Olmesartan 20 mg Monotherapy) | 38 Participants |