Skip to content

Health and Environmental Effects of Boiler Management Systems in Social Housing

Randomised Controlled Trial of Boiler Management Systems in Social Housing in Camden: An Assessment of Health, Environmental and Economic Outcomes

Status
Completed
Phases
NA
Study type
Interventional
Source
ClinicalTrials.gov
Registry ID
NCT00874692
Enrollment
150
Registered
2009-04-02
Start date
2009-04-30
Completion date
2009-11-30
Last updated
2010-06-02

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Hot Water Burns (Scalds)

Keywords

tap water temperature, social housing, scald reduction, Temperature (degrees Celsius) of hot tap water at point of delivery.

Brief summary

The purpose of this study is to evaluate the impact of a passive safety measure, namely a reduction in centrally controlled hot tap water temperatures in social housing using a boiler management system, as an effective public health intervention.

Detailed description

The annual hospital admission rate in England for burns and scalds is 31 children per 100,000 population. While reducing the temperature in domestic hot water tanks is a recommended injury prevention strategy, the UK has been slow to adopt such 'passive' safety measures. However, Camden Council employs a Boiler Management System (BMS) in boiler houses to centrally set the hot water temperature for parts of its social housing stock, providing the opportunity to evaluate various impacts of a 'passive' safety measure, including quantifying the effects of the BMS on average hot water temperatures at delivery, annual energy costs, and annual greenhouse gas emissions; modelling the reduction in scald injuries; identifying the cost-effectiveness of the system as a public health intervention; as well as describing experiences/ perceptions of risk of scalding and identifying health and social benefits of the BMS. Boiler houses with BMS will be randomised to remain at their constant set temperature or to BMS reduced temperature and sterilisation programme. A process evaluation will also be undertaken to assess the acceptability of water temperatures to tenants.

Interventions

OTHERBMS and sterilisation programme

BMS with reduced hot water temperature and sterilisation programme

Sponsors

Camden Primary Care Trust, London
CollaboratorUNKNOWN
London Borough of Camden Housing and Adult Social Care Directorate
CollaboratorUNKNOWN
London School of Hygiene and Tropical Medicine
Lead SponsorOTHER

Study design

Allocation
RANDOMIZED
Intervention model
PARALLEL
Masking
NONE

Eligibility

Sex/Gender
ALL
Age
18 Years to No maximum
Healthy volunteers
Yes

Inclusion criteria

* Individuals living in social housing in the London Borough of Camden where the Boiler Management system has been installed.

Exclusion criteria

* Aged under 18 years

Design outcomes

Primary

MeasureTime frame
Thermal energy (degrees Celsius) at hot tap of bathafter 1 minute

Secondary

MeasureTime frame
Acceptability of hot water temperature delivered to tenantUp to 2-3 months post-intervention

Countries

United Kingdom

Outcome results

None listed

Source: ClinicalTrials.gov · Data processed: Mar 28, 2026