Skip to content

Monoamine Transporter Function and Autonomic Regulation During Psychodynamic Psychotherapy

Status
Completed
Phases
Unknown
Study type
Observational
Source
ClinicalTrials.gov
Registry ID
NCT00594711
Enrollment
26
Registered
2008-01-16
Start date
2000-01-31
Completion date
2008-12-31
Last updated
2011-10-31

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Depression

Keywords

Psychotherapy, depression

Brief summary

Outcome of psychodynamic psychotherapy measured by \[123I\] nor-B-CIT SPET imaging Background Psychodynamic psychotherapy is a widely practised form of psychotherapy in the treatment of depression. There is evidence that serotonin transporter (SERT) densities are altered in depression. Preliminary observations have suggested that SERT function may recover in connection with dynamic psychotherapy. The objective was to determine whether SERT densities change in relation to clinical recovery during psychodynamic psychotherapy.

Detailed description

N=26 Method Twenty six drug-naïve currently depressed (moderate/severe) patients with no previous treatment were recruited for the study. The baseline study included a group of 18 healthy controls. The patients were randomised into psychotherapy and waiting-list control groups. For controls, psychotherapy was started after a 6-month waiting period. \[123I\] nor-B-CIT SPET imaging was performed at baseline and after 12 months of psychotherapy. For the controls, additional imaging was performed after the 6-month waiting period.

Interventions

None listed

Sponsors

University of Eastern Finland
CollaboratorOTHER
Kuopio University Hospital
Lead SponsorOTHER

Study design

Observational model
CASE_CONTROL
Time perspective
PROSPECTIVE

Eligibility

Sex/Gender
ALL
Age
18 Years to 55 Years
Healthy volunteers
No

Inclusion criteria

* depression

Exclusion criteria

* antidepressive medication

Outcome results

None listed

Source: ClinicalTrials.gov · Data processed: Feb 4, 2026