Skip to content

Physical Therapy After Anti-spastic Treatment in Children With Cerebral Palsy

Physical Therapy With Versus Without Strength Training After Botulinum-toxin Treatment in Children With Cerebral Palsy

Status
Completed
Phases
NA
Study type
Interventional
Source
ClinicalTrials.gov
Registry ID
NCT00552721
Enrollment
14
Registered
2007-11-02
Start date
2007-10-31
Completion date
2009-07-31
Last updated
2009-09-07

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Cerebral Palsy

Keywords

Motor control, Spasticity

Brief summary

It is the primary purpose of this pilot study to investigate if physical therapy with strength training is better at improving muscle and gait function after anti-spastic treatment with Botulinum toxin compared to physical therapy without strength training in children with cerebral palsy. The investigators hypothesize that it is.

Interventions

OTHERPhysical therapy with strength training

12 weeks of physical therapy after Botulinum-toxin treatment (two 45-min sessions/week) with an emphasis on strength training.

OTHERPhysical therapy without strength training

12 weeks of physical therapy after Botulinum-toxin treatment (two 45-min sessions/week) without strength training.

Sponsors

Hvidovre University Hospital
Lead SponsorOTHER

Study design

Allocation
RANDOMIZED
Intervention model
PARALLEL
Primary purpose
TREATMENT
Masking
SINGLE (Outcomes Assessor)

Eligibility

Sex/Gender
ALL
Age
7 Years to 18 Years
Healthy volunteers
No

Inclusion criteria

* cerebral palsy (diplegia and hemiplegia) * indication for anti-spastic treatment with Botulinum toxin

Exclusion criteria

* fixed contractures

Design outcomes

Primary

MeasureTime frame
Three-dimensional gait analysis12 weeks
Selective motor control12 weeks

Secondary

MeasureTime frame
Spasticity (modified Ashworth)12 weeks
Range of motion12 weeks

Countries

Denmark

Outcome results

None listed

Source: ClinicalTrials.gov · Data processed: Feb 4, 2026