Skip to content

A Comparison of Manual vs. Spontaneous Removal of the Placenta at Cesarean Section

A Comparison of Manual vs. Spontaneous Removal of the Placenta at Cesarean Section

Status
Completed
Phases
NA
Study type
Interventional
Source
ClinicalTrials.gov
Registry ID
NCT00375986
Enrollment
150
Registered
2006-09-13
Start date
2006-09-30
Completion date
2007-06-30
Last updated
2007-11-14

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Cesarean Section, Pregnancy

Keywords

Cesarean delivery, Placental removal, Blood loss

Brief summary

The purpose of this study is to determine if there are differences in operative blood loss with manual vs. spontaneous removal of the placenta during cesarean section.

Detailed description

Patients undergoing scheduled cesarean deliveries are randomized to manual or spontaneous placental removal.

Interventions

PROCEDUREManual placental removal at Cesarean delivery
PROCEDURESpontaneous placental removal at Cesarean delivery

Sponsors

University of Rochester
Lead SponsorOTHER

Study design

Allocation
RANDOMIZED
Intervention model
SINGLE_GROUP
Masking
NONE

Eligibility

Sex/Gender
FEMALE
Age
18 Years to No maximum
Healthy volunteers
No

Inclusion criteria

* All term pregnant women 18 years of age and older undergoing scheduled cesarean delivery at Strong Memorial Hospital.

Exclusion criteria

* Prematurity (\<37 weeks) * Preoperative chorioamnionitis * Vaginal delivery of fetus * Emergency Cesarean Delivery * Patient's OB not agreeable to participating in this study.

Design outcomes

Primary

MeasureTime frame
Hematocrit levels (preoperatively and within 48 hours postoperatively)

Secondary

MeasureTime frame
Number of units of blood transfused intraoperatively and postoperatively
Development of uterine infection (endometritis)
Length of postoperative hospital stay
Operative time

Countries

United States

Outcome results

None listed

Source: ClinicalTrials.gov · Data processed: Feb 4, 2026