Skip to content

Multi-Center Registry Trial of EXCEL Biodegradable Polymer Drug-Eluting Stent

Multi-Center Registry Trial of EXCEL Biodegradable Polymer Drug-Eluting Stent

Status
Completed
Phases
Phase 4
Study type
Interventional
Source
ClinicalTrials.gov
Registry ID
NCT00331578
Acronym
CREATE
Enrollment
2077
Registered
2006-05-31
Start date
2006-06-30
Completion date
2006-12-31
Last updated
2009-01-21

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

AMI

Brief summary

The trial aims to evaluate 12-month long-term efficiency of Excel stent in the treatment of coronary heart disease and inhibition of restenosis after coronary artery stenting as well as a 12 months' long-term safety after the cessation of clopidogrel as an anti-platelet drugs used for 6 months after the implantation of degradable drug coating stent.

Interventions

DEVICEExcel drug-eluting coronary artery stent

Sponsors

JW Medical Systems Ltd
Lead SponsorINDUSTRY

Study design

Allocation
NON_RANDOMIZED
Intervention model
SINGLE_GROUP
Primary purpose
TREATMENT
Masking
NONE

Eligibility

Sex/Gender
ALL
Healthy volunteers
No

Inclusion criteria

1. Patient who should be full fill the criteria of using Excel stent. 2. Each included patient should allowed to use Excel stent. 3. Complete revascularization can be achieved through one invasive operation.

Exclusion criteria

1. Patient do not suitable to use Excel stent, for example, not tolerant to anti-platelet drug or undergo cardiac/non-cardiac surgery recently. 2. Patient with multiple branch lesions, thus the single Excel stent cannot resolve the condition. 3. NYH Cardiac functional grading\>3 or Echocardiography LVEF\<0.3. 4. Patient with complete revascularization cannot be resolved by one operation.

Design outcomes

Primary

MeasureTime frame
MACE(Major adverse cardiac events)12 months

Secondary

MeasureTime frame
MACE30 days and 6 months

Outcome results

None listed

Source: ClinicalTrials.gov · Data processed: Apr 3, 2026