Skip to content

Multicenter Randomized Prospective Trial Comparing Methotrexate Alone or in Combination With Adalimumab in Early Arthritis

Methotrexate Alone Versus Methotrexate in Combination With Adalimumab in Early Arthritis

Status
UNKNOWN
Phases
Phase 4
Study type
Interventional
Source
ClinicalTrials.gov
Registry ID
NCT00291915
Enrollment
80
Registered
2006-02-15
Start date
2004-05-31
Completion date
2007-03-31
Last updated
2006-02-15

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Arthritis, Rheumatoid Arthritis

Keywords

early arthritis, methotrexate, adalimumab

Brief summary

Evaluation of two treatment modalities in early potentially severe early arthritis ( Methotrexate alone or in combination with adalimumab)

Detailed description

Patients: early ( less than 6 months), active ( DAS\>5.2),potentially severe ( Leiden score\>6) Study design:12 months, prospective , randomized, open Study treatments: Methotrexate at a weekly dose of 0.3mg/kilo alone or in combination with adalimumab 40 mg every the other week Outcome measures: DAS over the 12 months

Interventions

DRUGAdalimumab
DRUGMethotrexate

Sponsors

Goupe d'Etudes et de Recherche Clinique En Rhumatologie
Lead SponsorOTHER

Study design

Allocation
RANDOMIZED
Intervention model
PARALLEL
Primary purpose
TREATMENT
Masking
NONE

Eligibility

Sex/Gender
ALL
Age
18 Years to No maximum
Healthy volunteers
No

Inclusion criteria

* Early Active Potentially severe arthritis

Exclusion criteria

* contra indication of methotrexate or anti TNF

Design outcomes

Primary

MeasureTime frame
Disease Activity Score

Secondary

MeasureTime frame
-Radiological score
-Functional impairment ( HAQ)
-Pain (VAS)

Countries

France

Contacts

Primary ContactMaxime r DOUGADOS, MD
maxime.dougados@cch.aphp.fr00 33 1 58 41 25 62
Backup ContactMartin SOUBRIER, MD
msoubrier@chu-clermontferrand.fr00 33 6 81 74 78 85

Outcome results

None listed

Source: ClinicalTrials.gov · Data processed: Feb 4, 2026