Skip to content

Phase II Study of the Pathophysiology and Treatment With Enalapril and Polystyrene Sulfonate for Pseudohypoaldosteronism, Type I

Status
Completed
Phases
Phase 2
Study type
Interventional
Source
ClinicalTrials.gov
Registry ID
NCT00004328
Enrollment
1
Registered
1999-10-19
Start date
1992-12-31
Completion date
Unknown
Last updated
2005-06-24

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Pseudohypoaldosteronism

Keywords

endocrine disorders, pseudohypoaldosteronism, rare disease

Brief summary

OBJECTIVES: I. Establish the sodium and potassium intake that will maintain a normovolemic state in a patient with pseudohypoaldosteronism. II. Determine the effect of extracellular fluid volume and serum potassium manipulations on exercise tolerance, cardiac function, and endurance. III. Investigate pharmacologic methods of limiting excretion of sodium in urine and sweat.

Detailed description

PROTOCOL OUTLINE: Sodium and potassium intake resulting in normalization of serum electrolytes and markers of extracellular volume are determined at baseline. A trial diet is then prescribed, with adjustments made to achieve a steady state with normal serum electrolytes. Exercise tolerance and muscle function are evaluated at steady state. Sodium and potassium are sequentially manipulated with diet, enalapril, and polystyrene sulfonate. Exercise tolerance is evaluated during each diet period. A treatment plan to maintain electrolyte balance is developed. The patient is followed monthly for 3 to 6 months, then every 3 months for up to 3 years.

Interventions

DRUGenalapril

Sponsors

University of Texas
CollaboratorOTHER
National Center for Research Resources (NCRR)
Lead SponsorNIH

Study design

Primary purpose
TREATMENT

Eligibility

Sex/Gender
ALL
Age
0 Years to No maximum
Healthy volunteers
No

Inclusion criteria

PROTOCOL ENTRY CRITERIA: Pseudohypoaldosteronism

Outcome results

None listed

Source: ClinicalTrials.gov · Data processed: Feb 4, 2026