Skip to content

Gastro-fix powder efficacy in pediatric acute gastroenteritis

Evaluation of Gastro-fix powder efficacy in pediatric acute gastroenteritis

Status
Recruiting
Phases
Phase 3
Study type
Interventional
Source
IRCT
Registry ID
IRCT20240508061709N1
Enrollment
160
Registered
2024-05-12
Start date
2024-05-21
Completion date
Unknown
Last updated
2024-05-27

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Gastroenteritis. Viral intestinal infection, unspecified

Interventions

Intervention 1: Intervention group: patients will receive Gastro-fix, 9 g/kg in three divided doses per day. Intervention 2: Control group: patients will receive regular formula 9 g/kg in three divide

Sponsors

Ghoum University of Medical Sciences
Lead Sponsor

Eligibility

Sex/Gender
All
Age
6 Months to 2 Years

Inclusion criteria

Inclusion criteria: formula feed children with acute gastroenteritis aged 6 to 24 months

Exclusion criteria

Exclusion criteria: dysentery chronic diarrhea severe dehydration malnutrition underlying diseases (such as inflammatory bowel disease; necrotizing enterocolitis; immune deficiency, etc.) Lack of parental consent

Design outcomes

Primary

MeasureTime frame
Length of hospitalization. Timepoint: after intervention. Method of measurement: Number of hospitalization days.;Frequency of diarrhea. Timepoint: after intervention. Method of measurement: Number.

Secondary

MeasureTime frame
Percentage of dehydration. Timepoint: Before and after the intervention. Method of measurement: The percentage of dehydration according to the dehydration scale of the World Health Organization.;Stool consistency. Timepoint: before and after intervention. Method of measurement: stool consistency score.

Countries

Iran (Islamic Republic of)

Contacts

Public ContactFahime Aliahavandi

Ghoum University of Medical Sciences

F.aalishavandi24@gmail.com+98 25 3162 5224

Outcome results

None listed

Source: IRCT (via WHO ICTRP) · Data processed: Feb 4, 2026