Skip to content

Flexible tongue-in-groove technique compared to columellar strut and septocolumellar suture technique

Flexible tongue-in-groove technique compared to columellar strut and septocolumellar suture technique in open rhinoplasty

Status
Active, not recruiting
Phases
Unknown
Study type
Interventional
Source
IRCT
Registry ID
IRCT20240104060611N1
Enrollment
80
Registered
2024-07-04
Start date
2023-09-23
Completion date
Unknown
Last updated
2024-07-22

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

rhinoplasty.

Interventions

Intervention 1: Intervention group: Flexible tongue-in-groove technique. Intervention 2: Intervention group: Columellar strut with septocolumellar suture technique.

Sponsors

Shahid Beheshti University of Medical Sciences
Lead Sponsor

Eligibility

Sex/Gender
All

Inclusion criteria

Inclusion criteria: All the pations who have undergone open rhinoplasty surgery

Exclusion criteria

Exclusion criteria: Applicants for closed rhinoplasty surgery Patients who undergo rhinoplasty surgery for the second time Patients who undergo surgery using other techniques Patients who undergo surgery using both techniques People who don't have standard images or adequate images

Design outcomes

Primary

MeasureTime frame
Nasolabial angle. Timepoint: 1, 3 ,and 12 months after surgery. Method of measurement: The angle between two lines A and B (line A between subnasal and vermilion border, line B between subnasal and nasal columellar breakpoint.;Nasal tip projection. Timepoint: 1, 3 ,and 12 months after surgery. Method of measurement: Goode ratio is calculated by dividing the distance from the nasal tip to the alar base (A') by the distance from the nasal tip to the nasion (B').

Countries

Iran (Islamic Republic of)

Contacts

Public ContactNiloufar Shabani

Shahid Beheshti University of Medical Sciences

niloufarshabani1377@gmail.com+98 21 3333 3333

Outcome results

None listed

Source: IRCT (via WHO ICTRP) · Data processed: Feb 4, 2026