Skip to content

Effects of Wobble board and CrossFit training in athletes with ankle instability

COMPARATIVE EFFECTS OF WOBBLE BOARD AND CROSSFIT TRAINING IN ATHLETES WITH CHRONIC ANKLE INSTABILITY

Status
Recruiting
Phases
Unknown
Study type
Interventional
Source
IRCT
Registry ID
IRCT20231103059941N1
Enrollment
34
Registered
2023-11-15
Start date
2023-12-06
Completion date
Unknown
Last updated
2024-01-22

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Chronic Ankle Instability.

Interventions

Intervention 1: Intervention group 1(WOBBLE BOARD TRAINING): The wobble board is a circular platform (30 inches) with different-sized domes that screw into the bottom of the board to make balance exer

Sponsors

Riphah International University, Lahore
Lead Sponsor

Eligibility

Sex/Gender
All
Age
18 Years to 40 Years

Inclusion criteria

Inclusion criteria: Age ranging from 18 to 40 years. Perform cardiovascular or resistance training for at least 1.5 hours per week. A previous ankle sprain at least 6 months before the study. Recurrent feeling of “giving way.” A score of 25 or less on the CAIT(cumberland ankle instability tool) to confirm current ankle-joint instability.

Exclusion criteria

Exclusion criteria: Self-reported vestibular or balance-related dysfunction. An acute ankle sprain in the previous 6 weeks. Recent surgery(knee, hip, ankle). Being a habitual CrossFit practitioner.

Design outcomes

Primary

MeasureTime frame
Chronic ankle instability. Timepoint: 0-6 weeks (before and after intervention). Method of measurement: Cumberland Ankle Instability Tool (CAIT).

Secondary

MeasureTime frame
Dynamic Balance. Timepoint: 0-6 weeks (before and after intervention). Method of measurement: Star Excursion Balance Test (SEBT).

Countries

Pakistan

Contacts

Public ContactNida Shabbir

Riphah International University, Lahore

nidas2765@gmail.com+92 301 4857099

Outcome results

None listed

Source: IRCT (via WHO ICTRP) · Data processed: Feb 4, 2026