Skip to content

Effectiveness of family centered play-based interventions on sensory pattern and occupational performance of children with autism spectrum disorder

Effectiveness of family centered play-based interventions on sensory pattern and occupational performance of children with autism spectrum disorder

Status
Active, not recruiting
Phases
Unknown
Study type
Interventional
Source
IRCT
Registry ID
IRCT20211114053055N1
Enrollment
48
Registered
2022-02-02
Start date
2022-02-20
Completion date
Unknown
Last updated
2022-02-07

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Autism Spectrum Disorder. Autistic disorder

Interventions

Intervention 1: Intervention group: the researcher teaches the parents how to play the selected games that are in accordance with the evaluations performed and the reported sensory pattern of the chil

Sponsors

Tehran University of Medical Sciences
Lead Sponsor

Eligibility

Sex/Gender
All
Age
3 Years to 6 Years

Inclusion criteria

Inclusion criteria: Children with autism spectrum disorder at the age of 3 to 6 years Existence of sensory processing disorder No history of seizures or epilepsy No accompanying physical problems GARS score below 80 (Autism level 1 and 2) Parents of children must have at least a diploma level of education.

Exclusion criteria

Exclusion criteria: Lack of parents or child cooperation at any stage of the study

Design outcomes

Primary

MeasureTime frame
Occupational performance. Timepoint: After two months and after the end of the intervention. Method of measurement: Canadian Occupational Performance Measure.;Sensory processing. Timepoint: After two months and after the end of the intervention. Method of measurement: Canadian Occupational Performance Measure.

Countries

Iran (Islamic Republic of)

Contacts

Public ContactParvin Raji

Tehran University of Medical Sciences

praji@tums.ac.ir009877538798

Outcome results

None listed

Source: IRCT (via WHO ICTRP) · Data processed: Feb 4, 2026