Skip to content

Comparison of intraocular pressure results of glaucoma patients treated by deep sclerectomy with and without descmet membrane fenestration

Comparison of intraocular pressure of glaucoma patients treat by deep sclerectomy with and without descmet membrane fenestration

Status
Recruiting
Phases
Unknown
Study type
Interventional
Source
IRCT
Registry ID
IRCT20161218031450N8
Enrollment
20
Registered
2024-10-03
Start date
2024-10-06
Completion date
Unknown
Last updated
2025-01-08

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Glaucom. Open-angle glaucoma

Interventions

Intervention 1: Control group: the patients of this group undergo deep sclerectomy surgery, the congeal is separated from the limbus area, then a surface scleral flap with a size of 5x5 with a thickne

Sponsors

Tabriz University of Medical Sciences
Lead Sponsor

Eligibility

Sex/Gender
All

Inclusion criteria

Inclusion criteria: All patients with open angle glaucom with unconrolled iop All patients with open angle glaucom who need few types of drugs All patients with open angle glaucom With advanced cupping All patients with open angle glaucom With visual field defect All patients with open angle glaucom without compliance of drug use

Exclusion criteria

Exclusion criteria: History of previous surgry One eye patient Patients with uveitis Patients with infection Patients with corneal disease Patients with diabet and hypertention Patients with neovascular glaucom

Design outcomes

Primary

MeasureTime frame
Intraocular pressure. Timepoint: ?day/1week / 1 month/4 months. Method of measurement: Applanation tononeter (goldman).;Visual acuity. Timepoint: ?day/1week / 1 month/4 months. Method of measurement: Snellen chart.

Countries

Iran (Islamic Republic of)

Contacts

Public ContactRasa mehdizadehfar

Tabriz University of Medical Sciences

Rasamf8@gmail.com+98 41 3657 7332

Outcome results

None listed

Source: IRCT (via WHO ICTRP) · Data processed: Feb 4, 2026