Skip to content

Observational study of the relationship between the change of blood presure in body psition and cardiovascular events in elderly in China

Observational study of the relationship between the change of blood presure in body psition and cardiovascular events in elderly in China

Status
Active, not recruiting
Phases
Unknown
Study type
Observational
Source
ChiCTR
Registry ID
ChiCTR-ROC-17011230
Enrollment
Unknown
Registered
2017-04-24
Start date
2017-06-01
Completion date
Unknown
Last updated
2017-05-09

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Hypertension

Interventions

60 to 65 years group, 65 to 79 year group
80 years and elder group:Nil

Sponsors

the Second Affiliated Hospital of Nanjing Medical University
Lead Sponsor

Eligibility

Sex/Gender
All
Age
60 Years to No maximum

Inclusion criteria

Inclusion criteria: 1. Aged 60 years old and elder; 2. Systolic blood pressure >=140 and (or) diastolic >=90mmHg 2 times or more on different days without taking antihypertensive drugs. It is divided into I, II, III grade according to blood pressure levels: 140~159/90~99mmHg is defined as hypertension I. 160~179/100~109mmHg is considered to be hypertension II and 180/110mmHg or above is hypertension III; 3. After taking antihypertensive drugs with normal blood pressure; 4. Sign the informed consent.

Exclusion criteria

Exclusion criteria: 1. Secondary hypertension; 2. Pseudo hypertension (exclude through the home self testing blood pressure or ambulatory blood pressure); 3. Acute, severe or end stage of various chronic diseases; 4. Patients dignosed with malignant tumor in stable period; 5. Refused to sign the informed consent.

Design outcomes

Primary

MeasureTime frame
Blood pressure;

Countries

China

Contacts

Public ContactLu Xiang

The Second Affiliated Hospital of Nanjing Medical University

luxiang66@njmu.edu.cn+86 18951762639

Outcome results

None listed

Source: ChiCTR (via WHO ICTRP) · Data processed: Feb 4, 2026