Skip to content

Two methods of intrauterine packing combined with preventive iliac artery balloon orary occlusion in placenta previa cerean section: a prospective randomized controlled study

Two methods of intrauterine packing combined with preventive iliac artery balloon orary occlusion in placenta previa cerean section: a prospective randomized controlled study

Status
Recruiting
Phases
Unknown
Study type
Interventional
Source
ChiCTR
Registry ID
ChiCTR-ICR-15007078
Enrollment
Unknown
Registered
2015-09-10
Start date
2015-08-01
Completion date
Unknown
Last updated
2017-04-18

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Placenta previa

Interventions

A:intrauterine inflated balloon
B:gauze packing

Sponsors

Nanjing Drum Tower Hospital The Affiliated Hospital of Nanjing University Medical School
Lead Sponsor

Eligibility

Sex/Gender
Female
Age
18 Years to 50 Years

Inclusion criteria

Inclusion criteria: In the past have history of cerean section, after 28 weeks of pregnancy, ultrasound or MRI tip attachment in as scar uterine lower segment cerean section of placenta previa or not associated with placenta accreta, pregnant women informed consent need to splits the palace production termination of pregnancy in women. And further confirmed by cerean section.

Exclusion criteria

Exclusion criteria: 1. The operation with artery ligation, uterine compression suture, embolization, hysterectomy patients; 2. surgery without uterine incision placed intrauterine packing, postoperative placement; 3. <28 weeks of gestation; 4. Suspicion of serious infection; 5. The doctors considered that other stuation not suitable for the study.

Design outcomes

Primary

MeasureTime frame
the average amount of 24 hours PPH;he rate of successful hemostasis;Uterine retention rate;Operative complication;

Countries

China

Contacts

Public ContactYali Hu
Glyyhuyali@163.com+86 13951846008

Outcome results

None listed

Source: ChiCTR (via WHO ICTRP) · Data processed: Feb 4, 2026