Skip to content

Comparison Of Two Pain Relief Techniques Before Nerve Block In The Neck

Efficacy Of Superficial Cervical Plexus Block versus Local Infiltration As A Mode Of Analgesia Before Brachial Plexus Block Procedure In The Neck A Prospective Randomized Control Study - NIL

Status
Active, not recruiting
Phases
Phase 3Phase 4
Study type
Interventional
Source
CTRI
Registry ID
CTRI/2026/04/108614
Enrollment
48
Registered
2026-04-17
Start date
Unknown
Completion date
Unknown
Last updated
2026-04-27

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Health Condition 1: O- Medical and Surgical

Interventions

Intervention1: Superficial Cervical Plexus Block: Superficial Cervical Plexus Block For Analgesia Before Brachial Plexus Block Control Intervention1: Local Infiltration: Local Infiltration For Analges

Sponsors

Chettinad Hospital And Research Institute
Lead Sponsor

Eligibility

Inclusion criteria

Inclusion criteria: ASA Physical Status I or II Patients With Age 18 to 65 Years Patients Posted For Upper Limb Surgeries

Exclusion criteria

Exclusion criteria: Refusal To Participate Allergy To Local Anesthetics Coagulopathy Or Bleeding Disorders Infection At The Injection Site Pre Existing Neurological Deficits In The Upper Limbs

Design outcomes

Primary

MeasureTime frame
To compare Verbal pain rating scale during the BPB procedure between the Superficial cervical plexus block and local infiltration groups.Timepoint: Baseline pre procedure During procedure Before Brachial plexus block After 5mins of procedure

Secondary

MeasureTime frame
To evaluate patient satisfaction with five point likert scale. To study hemodynamic changesTimepoint: Baseline Pre procedure During procedure Before Brachial plexus block After 5mins of procedure

Countries

India

Contacts

Public ContactDR ASIF MOHAMED P

DR VIJAY NARAYANAN S

Mohamedasif419@gmail.com8760361406

Outcome results

None listed

Source: CTRI (via WHO ICTRP) · Data processed: May 1, 2026