Skip to content

Does Early Physiotherapy After Back Surgery Improve Recovery

early post operative rehabilitation protocol in individuals with lumber laminectomy - NIL

Status
Active, not recruiting
Phases
Phase 1
Study type
Interventional
Source
CTRI
Registry ID
CTRI/2026/03/106691
Enrollment
25
Registered
2026-03-23
Start date
Unknown
Completion date
Unknown
Last updated
2026-03-30

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Health Condition 1: M511- Thoracic, thoracolumbar and lumbosacral intervertebral disc disorders with radiculopathy

Interventions

Intervention1: early post operative rehabilitation protocol: Day 1 -4 (Cryotherapy, TENS, Bed mobility and training Lumbar segmental control exercise ( Transverse abdominis activation , multifudus co

Sponsors

maharishi markandeshwar Institute of Physiotherpy and Rehabilitation mullana Ambala Haryana
Lead Sponsor

Eligibility

Inclusion criteria

Inclusion criteria: Patients who underwent lumbar laminectomy

Exclusion criteria

Exclusion criteria: Patients were excluded if they had arthritis in the joints of the lower limbs (which would limit walking), tumors, fractures, and infections of the spine, diabetes mellitus, polyneuropathy,evidence of spinal cord compression, previous spinal surgery, spinal stability problems, and sensory loss. Patients who declined to participate in the study or who did not sign the informed consent were also excluded

Design outcomes

Primary

MeasureTime frame
Pain reduction measured by Numerical Pain Rating Scale (NPRS) in patients after lumbar laminectomy.Timepoint: Baseline (Day 1) and After completion of intervention (Day 14)

Secondary

MeasureTime frame
Functional disability measured by Oswestry Disability Index (ODI).Timepoint: Baseline (Day 1) and Day 14 after intervention.

Countries

India

Contacts

Public ContactAmit Raj

MMIPR

amitraj808581@gmail.com7033808581

Outcome results

None listed

Source: CTRI (via WHO ICTRP) · Data processed: Apr 4, 2026