Skip to content

A study to compare two different hormone treatment methods used for ovarian stimulation and their outcomes in subfertile women undergoing frozen embryo transfer.

Comparison of Assisted Reproductive Technology Outcomes in Progestin Primed Ovarian Stimulation Versus Gonadotropin Releasing Hormone Antagonist Protocol in Sub fertile Women in Frozen Embryo Transfer Cycle: An Open Label Randomized Controlled Trial - NIL

Status
Active, not recruiting
Phases
Unknown
Study type
Interventional
Source
CTRI
Registry ID
CTRI/2026/02/102754
Enrollment
94
Registered
2026-02-02
Start date
Unknown
Completion date
Unknown
Last updated
2026-03-02

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Health Condition 1: N970- Female infertility associated withanovulation

Interventions

Intervention1: Tab.Medroxyprogesterone acetate 10 mg: Patients in this group will receive a PPOS protocol. Ovarian stimulation will begin on day 2 or 3 of the menstrual cycle after transvaginal ultr

Sponsors

Department of Reproductive Medicine
Lead Sponsor

Eligibility

Inclusion criteria

Inclusion criteria: Sub fertile women aged 21 to 38 years who are willing to participate in the study and willing for freeze all strategy.

Exclusion criteria

Exclusion criteria: 1. Grade 3 or higher endometriosis 2. Recurrent miscarriage with 2 or more spontaneous abortion 3. Uterine structure abnormality

Design outcomes

Primary

MeasureTime frame
Number of oocytes retrieved, number of mature oocytes and number of D3/D5 embryo.Timepoint: At the end of 18 months

Secondary

MeasureTime frame
It included duration & dosage of gonadotropins used, incidence of premature LH surge, oocyte maturity rate, clinical pregnancy & miscarriage rate.Timepoint: At the end of 18 months

Countries

India

Contacts

Public ContactDr Milan Dhariwal

Indira Gandhi Institute Of Medical Sciences

drkalpana1@yahoo.com

Outcome results

None listed

Source: CTRI (via WHO ICTRP) · Data processed: Mar 14, 2026