Skip to content

Comparison of Crestal Bone Loss and Bone Density Changes in Early vs. Delayed Implant Loading for Single Missing Posterior Mandibular Tooth: A Split-Mouth Clinical Study.

Comparative evaluation of crestal bone loss and bone density changes with early and delayed loading of implants for rehabilitation of single missing posterior mandibular tooth- A split-mouth in-vivo study - NIL

Status
Active, not recruiting
Phases
Phase 2Phase 3
Study type
Interventional
Source
CTRI
Registry ID
CTRI/2025/04/085966
Enrollment
9
Registered
2025-04-29
Start date
Unknown
Completion date
Unknown
Last updated
2025-05-26

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Health Condition 1: K089- Disorder of teeth and supporting structures, unspecified

Interventions

Intervention1: Early loading: 15 days postoperative loading of the implant will be don Control Intervention1: Delayed loading: 3 months postoperative loading will be done

Sponsors

Dr Yash Zawar
Lead Sponsor

Eligibility

Inclusion criteria

Inclusion criteria: Patient requiring replacement of single missing teeth in posterior mandible on either side Patients in the age group of 20-65 years of either sex Patient with good oral hygiene Bone height of more than or equal to 10mm and bone width of more than or equal to 3.5mm to accommodate dental implant Co-operative patient, willing for surgery and proper follow-up Opposing natural dentition must be present

Exclusion criteria

Exclusion criteria: Patients with systemic conditions Patients with poor oral hygiene Patients with insufficient bone height and width Patients who have any parafunctional habits Patients suffering from periodontal diseases Patients with a history of alcohol, drug dependency, smoking and poor health

Design outcomes

Primary

MeasureTime frame
To evaluate and compare the changes in peri-implant crestal bone level and bone density for rehabilitation of single missing posterior mandibular tooth with implants in split-mouth cases using early and delayed loading protocolTimepoint: baseline, 15 days, 3 months and 6 months

Secondary

MeasureTime frame
To evaluate and compare the changes in peri-implant crestal bone level and bone density for rehabilitation of single missing posterior mandibular tooth with implants in split-mouth cases using early and delayed loading protocolTimepoint: baseline, 15 days, 3 months and 6 months

Countries

India

Contacts

Public ContactRaghunath Patil

K.L.E V.K Institute of Dental science, Belgaum

raghunathpatil1@rediffmail.com7829910231

Outcome results

None listed

Source: CTRI (via WHO ICTRP) · Data processed: Feb 4, 2026