Skip to content

A clinical trail to assess the post operative effects of using ozonated water in dental implant placement procedure.

Comparative evaluation of short term and long term post-operative effects of using ozonated water and normal saline as an irrigant, on soft and hard tissues surrounding dental implants– a randomised controlled clinical trial.

Status
Active, not recruiting
Phases
Phase 3
Study type
Interventional
Source
CTRI
Registry ID
CTRI/2024/05/067551
Enrollment
34
Registered
2024-05-17
Start date
Unknown
Completion date
Unknown
Last updated
2024-07-22

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Health Condition 1: K084- Partial loss of teeth

Interventions

Intervention1: Ozonated water: Ozonated water will be made by saturating distilled water at concentration of 35 micrograms/ml for seven minutes with ozone gas generated by medical grade ozone generato

Sponsors

Krishna Vishwa Vidyapeeth
Lead Sponsor

Eligibility

Inclusion criteria

Inclusion criteria: healthy individuals or patients with controlled medical conditions, requiring minimum one dental implant on either side of their upper or lower arches, age 18-75 years, male or female, non-smokers, willingness to sign the informed consent form

Exclusion criteria

Exclusion criteria: lactating mothers or pregnant women, No bone grafting or augmentation procedures indicated, history of receiving radiotherapy in the head and neck region, patients having mucositis or parafunctional habits, systemically ill patients

Design outcomes

Primary

MeasureTime frame
decrease in post-operative pain faster soft tissue healing around the implantTimepoint: at baseline at 48 hours at 8 days

Secondary

MeasureTime frame
better degree of osseointegrationTimepoint: at 3 months

Countries

India

Contacts

Public ContactMayuri Surana

Krishna Vishwa Vidyapeeth

drkamnoorshubha@gmail.com9900154295

Outcome results

None listed

Source: CTRI (via WHO ICTRP) · Data processed: Feb 4, 2026