None listed
Conditions
Interventions
Control Intervention1: Nil: Nil
Control Intervention2: Nil: Nil
Sponsors
Council of Scientific and Industrial Research
Eligibility
Inclusion criteria
Inclusion criteria: Regular working employees and pensioners of CSIR with their spouses
Exclusion criteria
Exclusion criteria: pregnancy
Design outcomes
Primary
| Measure | Time frame |
|---|---|
| A Develop a binary prediction model for normal population turning Diabetic End Point- HbA1C greater than 6.5 with HbA1C less than 5.7 on baseline B Develop a binary prediction model for normal population to turning Pre Diabetic HbA1C greater than 5.7 and less than 6.5 with HbA1C less than less than 5.7 on baseline C Develop a binary prediction model for Fo/F1 to F2/F3/F4 on fibro scan Criteria LSM Score less than 6.5 on baseline and greater than or equal to 6.5 for end point Timepoint: 18, 36 and 54 months | — |
Secondary
| Measure | Time frame |
|---|---|
| As per short term objectivesTimepoint: 9 Months, 12 Months, 18 Months, 24 Months, 30 Months, 36 Months | — |
Countries
India
Contacts
Public ContactDr Shantanu Sengupta
CSIR-Institute of Genomics and Integrative Biology
Outcome results
None listed