Skip to content

Clinical and Dermoscopic evaluation of effectiveness of Metformin vs Pioglitazone in Acanthosis Nigricans.

Clinical and Dermoscopic evaluation to study the effectiveness of Metformin vs Pioglitazone in Acanthosis Nigricans - A Randomised Control Trial.

Status
Active, not recruiting
Phases
Phase 4
Study type
Interventional
Source
CTRI
Registry ID
CTRI/2023/01/048858
Enrollment
64
Registered
2023-01-10
Start date
Unknown
Completion date
Unknown
Last updated
2023-02-06

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Health Condition 1: L83- Acanthosis nigricans

Interventions

Intervention1: Metformin: 500 mg BD for 12 weeks Control Intervention1: Pioglitazone: 7.5 mg BD for 12 weeks

Sponsors

KLE Academy of Higher Education and Research - KLE University Grant
Lead Sponsor

Eligibility

Inclusion criteria

Inclusion criteria: •Adult patients (>=18 years) with acanthosis nigricans attending the outpatient department of dermatology in KLE Prabhakar Kore Hospital •Patients from whom written informed consent is obtained

Exclusion criteria

Exclusion criteria: •Patients already taking any oral hypoglycemic drug. •Patient diagnosed as Type 1 Diabetes Mellitus •Patient diagnosed as Drug induced AN •Patients diagnosed as AN due to known malignancy •Pregnant and lactating mothers •Known allergic reaction to either Metformin or Pioglitazone •Contraindicated for taking metformin or Pioglitazone

Design outcomes

Primary

MeasureTime frame
Difference in the reduction of neck lesions of Acanthosis Nigricans calculated using Burkes GradingTimepoint: At the end of 12 weeks

Secondary

MeasureTime frame
Dermoscopic evaluation of reduction of severity of neck lesions in Acanthosis NigricansTimepoint: At the end of 12 weeks

Countries

India

Contacts

Public ContactDr Jinisha Anand Jain

Jawaharlal Nehru Medical College

bhavs1982@gmail.com9422306523

Outcome results

None listed

Source: CTRI (via WHO ICTRP) · Data processed: Feb 4, 2026