Skip to content

Postoperative Pain Comparision After Single Visit Treatment Using Three Different Irrigation Methods

Assessment of postoperative pain after single visit endodontic therapy using three different irrigation techniques-A randomized clinical trial

Status
Active, not recruiting
Phases
Unknown
Study type
Interventional
Source
CTRI
Registry ID
CTRI/2019/06/019839
Enrollment
90
Registered
2019-06-25
Start date
Unknown
Completion date
Unknown
Last updated
2021-11-24

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Health Condition 1: K040- Pulpitis

Interventions

Intervention1: Single Visit Endodontic Treatment: Endodontic Treatment Will Be Performed And Intracanal Irrigation Will Be Done With Endoactivator Using 5 ml of irrigant in single visit therapy Interv

Sponsors

Do Conservative Dentistry and Endodontics
Lead Sponsor

Eligibility

Inclusion criteria

Inclusion criteria: Healthy Patients With First Or Second Mandibular Or A Maxillary Molar Or Premolar Having Diagnosed With Asymptomatic Irreversible Pulpitis

Exclusion criteria

Exclusion criteria: THOSE HAVING SYSTEMIC DISEASE, SWELLING,SINUS TRACT, OR PREOPERATIVE PALPATION PAIN , HAVING BRUXISM OR CLENCHING, A SEVERELY DAMAGED TOOTH OR RESORPTION IN RELATED TOOTH,HAVING PREVIOUSLY UNDERGONE RCT, HAVING TAKEN ANALGESICS DURING PAST 24 HOURS OR ABSENCE OF THE OPPOSING TOOTH

Design outcomes

Primary

MeasureTime frame
Outcome will be assessed by presence or absence of post operative pain.Timepoint: Outcome will be assessed by presence or absence of post operative pain after 6 hours,12 hours,24 hours and 48 hours.

Secondary

MeasureTime frame
the need for analgesics post treatment will be assessedTimepoint: the number of analgesics taken by the patient at 24 hours after treatment

Countries

India

Contacts

Public ContactSana Shadab

Dr.Ziauddin Ahmad Dental College,

dr_tiwarirk@yahoo.com9412820690

Outcome results

None listed

Source: CTRI (via WHO ICTRP) · Data processed: Feb 4, 2026