Skip to content

TO STUDY THE EFFECT OF DWIHARIDRADI LOHAM AND FERROUS SULPHATE ON PANDU

A STANDARD CONTROLLED CLINICAL TRIAL OF DWIHARIDRADI LOHAM IN THE MANAGEMENT OF PANDU WITH SPECIAL REFERENCE TO IRON DEFICIENCY ANAEMIA

Status
Active, not recruiting
Phases
Phase 1Phase 2
Study type
Interventional
Source
CTRI
Registry ID
CTRI/2018/08/015511
Enrollment
60
Registered
2018-08-28
Start date
Unknown
Completion date
Unknown
Last updated
2021-11-24

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Health Condition 1: D599- Acquired hemolytic anemia, unspecified

Interventions

Intervention1: NIL: NIL Control Intervention1: DWIHARIDRADI LOHAM: DWIHARIDRADI LOHAM 500 MG TWICE A DAY FOR 2 MONTHS Control Intervention2: FERROUS SULPHATE: FERROUS SULPHATE 200 MG ONCE A DAY FOR 2

Sponsors

NIL
Lead Sponsor

Eligibility

Inclusion criteria

Inclusion criteria: All types of Pandu Vyadhi Except Mrudbhakshanjanya Pandu as per described in Ayurvedic samhita

Exclusion criteria

Exclusion criteria: 1.Aneamia associated with other diseases like liver cirrhosis, ascitis, CCF, alcoholic liver diseases, HIV etc. 2. Patients suffering from other than iron deficiency anaemia ï?· 3.Patients with complication of Iron deficiency anaemia ï?· 4.Any type of malignant diseases ï?· ï?· 5.Acute Heamorrhagical and infectious condition ï?·6.Patient taking treatment from any other pathy for the same problem.

Design outcomes

Primary

MeasureTime frame
To Reduce Sign and Symptoms of Pandu As Following 1. Panduta (Pallor) 2. Aayasenshwas (Dyspnoea On Exertion) 3. AkshikootShotha (Periorbital Oedema) 4. Agni Mandya (Anorexia) 5. Dourbalya (Weakness) 6.CBC PROFILETimepoint: 2 MONTHS

Secondary

MeasureTime frame
NILTimepoint: NIL

Countries

India

Contacts

Public ContactDRSNEHAL BABURAO BHOSALE

COLLEGE OF AYURVEDA AND RESAEARCH CENTRE NIGADI PUNE

medhamaheshjoshi@gmail.com9881465798

Outcome results

None listed

Source: CTRI (via WHO ICTRP) · Data processed: Feb 4, 2026