Skip to content

A clinical trial to demonstrate effectiveness of a new drill system â??Densahâ?? in increasing bone width in sites of compromised bone while placing dental implants.

Novel Implant Site preparation using Densah Burs Osseodensification: A Clinical study

Status
Recruiting
Phases
Phase 4
Study type
Interventional
Source
CTRI
Registry ID
CTRI/2017/08/009496
Enrollment
60
Registered
2017-08-25
Start date
Unknown
Completion date
Unknown
Last updated
2021-11-24

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

Health Condition 1: null- Patients with one or more missing teeth in maxilla or mandible requiring implant supported fixed restoration.

Interventions

Intervention1: Implant site preparation using Densah Bur: Densah bur would be used to create osteotomy site. Bone ridge width pre and post osteotomy would be measured to assess if any change has occur

Sponsors

Dr Tarun Kumar AB
Lead Sponsor

Eligibility

Inclusion criteria

Inclusion criteria: 1.Patients having atleast one edentulous site with healthy adjacent teeth. 2.Edentulous ridge width of atleast 3mm as determined from CBCT 3.Patients with good oral hygiene (Oral Hygiene Index Simplified 4.Patients having good systemic health with no contradiction for implant surgery like uncontrolled diabetes, uncontrolled hypertension. 5.Capable of giving informed consent

Exclusion criteria

Exclusion criteria: 1.An immunocompromised medical history that would complicate the outcome of the procedure. 2.Patient smoking more than 5 cigarettes per day 3.Patient has a history of alcoholism or drug abuse during the last 5 years 4.Insufficient interarch space to accommodate the prosthodontics component. 5.Dental history of bruxism, Para functional oral habit and /or lack of stable posterior occlusion. 6.Pregnant and /or lactating mothers. 7.Patients who are uncooperative.

Design outcomes

Primary

MeasureTime frame
Bone ridge width before and  immediately after preparation of the implant site when  using the Densah Bur. Timepoint: Bone ridge width will be assessed at the same day of the surgery twice. Before and  immediately after preparation of the implant site  using the Densah Bur.Â

Secondary

MeasureTime frame
implant stability quotient  (ISQ). ISQ uses resonance frequency analysis to determine if  the newly prepared implant  site is stable enough for  immediate or early loading  of the actual dental  implant.Timepoint: ISQ will be measured on the day of the surgery immediately after implant placement and 6 weeks after main surgery.;insertion torque value(ITV).ITV is a measure of the rotational friction between the implant and the surrounding boneTimepoint: ITV will be measured on the day of the surgery at the time of implant insertion

Countries

India

Contacts

Public ContactDr Kriti mehrotra

Bapuji dental college & Hospital

tarundental@gmail.com9886210507

Outcome results

None listed

Source: CTRI (via WHO ICTRP) · Data processed: Feb 4, 2026