Skip to content

GLIFLOFASTER : EARLY GLIFLOZIN TREATMENT IN ELDERLY PATIENT HOSPITALIZED FOR DECOMPENSATED CHRONIC HEART FAILURE ADMITTED IN THE EMERGENCY ROOM - A FEASIBILITY STUDY

Status
Not yet recruiting
Phases
Phase 4
Study type
Interventional
Source
EU CTIS
Registry ID
CTIS2025-521101-40-00
Enrollment
144
Registered
2026-03-31
Start date
Unknown
Completion date
Unknown
Last updated
2026-03-31

For informational purposes only — not medical advice. Sourced from public registries and may not reflect the latest updates. Terms

Conditions

CHRONIC DECOMPENSATED HEART FAILURE

Brief summary

Organizational feasibility: setting up procedures, distribution of subjects in the flow chart. Acceptability based on refusal characteristics: number and reason. Adherence to the protocol and treatment: attrition, completeness of emergency CRF and IPA completion, proportion of patients contacted by telephone, compliance with the treatment and follow-up regimen. Compliance with the provisional timeline for the implementation of the study

Detailed description

A composite endpoint comprising the following at 3 months: - All-cause mortality - Rehospitalization or unplanned visit for CHF - Deterioration in quality of life: 5-point decrease after 3 months of treatment compared to the value measured at hospital discharge (KCCQ-12), Each of the three criteria of the composite criterion taken individually, A 50% decrease in NT-proBNP levels at 7 days (or upon discharge from hospital if earlier than 7 days) and at 3 months, Regression of clinical signs (dyspnea, asthenia, congestive signs) at 7 days (or upon discharge from hospital if earlier than 7 days) and at 3 months, Tolerance in relation to renal function: difference between glomerular filtration rate relative to baseline (at randomization) at 7 days (or at hospital discharge if earlier than 7 days) and at 3 months.

Interventions

DRUGDAPAGLIFLOZIN PROPANEDIOL MONOHYDRATE

Sponsors

Centre Hospitalier Regional Universitaire
Lead SponsorOTHER

Eligibility

Sex/Gender
All
Age
65 Years to No maximum

Design outcomes

Primary

MeasureTime frame
Organizational feasibility: setting up procedures, distribution of subjects in the flow chart. Acceptability based on refusal characteristics: number and reason. Adherence to the protocol and treatment: attrition, completeness of emergency CRF and IPA completion, proportion of patients contacted by telephone, compliance with the treatment and follow-up regimen. Compliance with the provisional timeline for the implementation of the study

Secondary

MeasureTime frame
A composite endpoint comprising the following at 3 months: - All-cause mortality - Rehospitalization or unplanned visit for CHF - Deterioration in quality of life: 5-point decrease after 3 months of treatment compared to the value measured at hospital discharge (KCCQ-12), Each of the three criteria of the composite criterion taken individually, A 50% decrease in NT-proBNP levels at 7 days (or upon discharge from hospital if earlier than 7 days) and at 3 months, Regression of clinical signs (dyspnea, asthenia, congestive signs) at 7 days (or upon discharge from hospital if earlier than 7 days) and at 3 months, Tolerance in relation to renal function: difference between glomerular filtration rate relative to baseline (at randomization) at 7 days (or at hospital discharge if earlier than 7 days) and at 3 months.

Outcome results

None listed

Source: EU CTIS · Data processed: Apr 1, 2026